KAMPONG AYER

KAMPONG AYER
A view of Kampong Ayer (also known as water village) at night time with colourful lights

Wednesday, April 18, 2012

Dream Home - Part 17

Finally, almost all have been fixed except for interior that need some touch up. All electrical wires from main to the house was connected and settled. Waiting for fuse delivery from JKR.


Route for electrical wire from junction box to the house
Arif was holding the Cangkul
Electrician fixing and connecting all wire to the house
Some changes made outside the kitchen.
Above: washing machine next to it
Below: Cabinet for the gas cylinders

The stainless steel handrail has arrived. Very neat hand welded.
This is what we called specialist in 'handling' stainless steel. Good job.

Updated: at last it's fixed. Looks nice and much better compared to the 1st one





Even the balcony looks strong after adding the bar on top of it